Every device.
Every drawing.
One defensible number.
ScopeLV reads your plan sets and specs, counts every low-voltage and fire-alarm device, and builds the bid — with every quantity traced back to the sheet it came from.
Live takeoff
Low-voltage bids are won and lost on the takeoff.
A missed card reader door, a riser counted twice, a drawing index mistaken for a plan — each one quietly moves your number. ScopeLV is built to catch exactly those errors before the bid leaves the building.
spent counting by hand
Estimators click through hundreds of symbols per set — time that should go into pricing strategy and winning work.
counts that hide in risers
The same device drawn on a floor plan and a riser gets priced twice. Alternates redraw plans you already counted.
scope gaps in the spec
Plenum cable, rated pathways, extended warranties — requirements buried in Division 27/28 that never make it to the bid.
From spec book to signed bid,
in one connected flow.
Three engines share one source of truth, so what the spec requires, what the plans show and what you price never drift apart.
Know the scope before you open the plans.
ScopeLV reads the project manual and surfaces the requirements that drive cost — each quoted in the spec's own words with the page it came from.
- Division 27/28 section index built automatically
- Cable and media ratings become your takeoff pick list
- Approved manufacturers and model numbers with source evidence
- Potential cost drivers flagged for verification
| Requirement | Section | Status |
|---|---|---|
| Plenum-rated (CMP) horizontal cable | 27 15 13 · p.4 | Cost driver |
| Addressable FACP, approved list | 28 46 21 · p.7 | 3 makers |
| 2-hour rated riser pathway | 27 05 28 · p.3 | Cost driver |
| Cat 6A to all WAP locations | 27 15 13 · p.6 | Pick list |
| 5-year extended warranty | 28 13 00 · p.12 | Verify |
Teach it the legend once. It counts the set.
ScopeLV learns the symbols from your project's own legend, filters the set to the sheets that matter, and counts every device — rejecting the look-alikes that fool simple pattern matching.
- Legend-learned symbol matching, including tagged devices
- Drops drawing indexes, alternates and unrelated trades
- Riser devices de-duplicated against floor plans
- Device IDs (CR-01, CAM-03) reconciled against symbol counts
| Device | Sheets | Count | Check |
|---|---|---|---|
| Card reader (CR) | T-101, T-102 | 21 | IDs match |
| Request-to-exit | T-101, T-102 | 21 | +3 assumed |
| Fixed camera | T-201 | 14 | Verified |
| Smoke detector | FA-101 – FA-104 | 86 | Verified |
| Data outlet | T-101 – T-104 | 142 | Riser de-duped |
Counts become a complete, defensible bid.
Labor hours, material, prevailing wage, markups, exclusions and schedule of values — assembled from the takeoff and exported to the Excel bid summary your team already uses.
- Labor units by device, with prevailing-wage support
- Marked assumptions, exclusions and clarifications
- NFPA 72 checks: battery, NAC voltage drop, candela
- Excel bid summary and handoff, ready to submit
| Cost element | Basis | Amount |
|---|---|---|
| Material | Device + cable BOM | $184,220 |
| Labor | 1,412 hrs · prevailing | $132,560 |
| Equipment & lifts | 6 weeks | $9,800 |
| Overhead & profit | 18% | $58,734 |
Four steps. No guesswork.
Upload the set
Drop in the plan set and project manual. ScopeLV reads title blocks — even sheets stored sideways.
Filter to scope
Low-voltage sheets are kept; indexes, alternates and other trades are set aside with a stated reason.
Count & verify
Devices are counted from the legend, reconciled against device IDs, and flagged where a human should look.
Price & ship
Labor, material and markups roll into a bid summary and schedule of values your team can submit.
Estimator judgment, encoded.
The trade rules that separate a winning low-voltage number from a costly one — built into the engine, not left to memory.
Legend-learned symbols
Reads the project legend — including table legends with stacked symbols — and matches each device as drawn on that job.
Smart sheet filter
Keeps the sheets that carry your scope and drops indexes, duplicate alternates, suppression and unrelated electrical.
False-match rejection
Ignores grey architectural linework, scale bars, stamps and dashed lines that look like devices to a naive matcher.
Device ID reconciliation
Every numbered device — CR-01, CAM-03, WAP-12 — counted once, then compared against the symbol count.
Per-door assumptions
When plans show fewer REX or door contacts than reader doors, the gap is added as a clearly marked assumption.
NFPA 72 design math
Battery sizing, NAC voltage drop, candela and spacing checks run alongside the takeoff — not in a separate spreadsheet.
Cable & pathway takeoff
Cable types pulled from the spec become the pick list for every run, so plenum, riser and outside-plant media are priced exactly as specified.
| Media | Feet |
|---|---|
| Cat 6A CMP | 41,200 |
| 18/2 FPLP | 18,650 |
| Composite access | 7,940 |
Excel bid handoff
Bid summary, schedule of values and device-by-device backup export in the format your estimators and PMs already trust.
Every number has a paper trail.
When a GC asks "where did 21 card readers come from?", your team answers in seconds. ScopeLV records every keep, drop, count and assumption with the sheet and reason behind it.
- Sheet-level reasons for every page kept or set aside
- Integrity gates stop a wrong total from shipping
- Flags for anything a senior estimator should review
See what your team gets back.
Set the inputs to match your shop. Every figure below is calculated from your numbers — nothing is assumed for you.
Estimate only. Calculated as estimators × bids × 12 months × hours × your expected saving. Your results depend on project type and drawing quality.
Your drawings. Your numbers. Your business.
Bid data is competitive intelligence. ScopeLV is designed so your plans, pricing and labor rates stay under your control.
Encrypted in transit
All traffic runs over TLS with HTTP Strict Transport Security enforced.
Processed on your device
Plan analysis runs in your browser, so drawings don't have to leave your machine to be counted.
Your pricing stays private
Labor rates, markups and bid history belong to you and are never shared across customers.
Hardened by default
Strict content security policy, no third-party trackers, and a published security contact.
Manual takeoff vs. ScopeLV
| Task | Manual | ScopeLV |
|---|---|---|
| Sort the plan set | Page through every sheet | Filtered automatically, with reasons |
| Count devices | Click each symbol by hand | Counted from the project legend |
| Catch double counts | Depends on who's counting | Risers and alternates de-duplicated |
| Find spec cost drivers | Read the full manual | Flagged with page citations |
| Defend the number | Rebuild from notes | Full audit trail, every line |
Answers for decision makers
Which trades does ScopeLV cover?
Division 27 and 28 scopes: fire alarm, access control, video surveillance, structured cabling, audio visual, intrusion, nurse call, paging and mass notification, and DAS/ERRCS.
Does it replace my estimators?
No. ScopeLV removes the counting and cross-checking so your estimators spend their time on pricing strategy, vendor quotes and the judgment calls that win work. Anything uncertain is flagged for them to review.
How does it handle drawings with unusual symbols?
It learns symbols from each project's own legend rather than a fixed library, including tagged devices and table-style legends with multiple symbols per row.
What do I get at the end?
A device-by-device takeoff with sheet references, a cable takeoff, a specification review, and an Excel bid summary with schedule of values, assumptions and exclusions.
How do we get started?
Request a demo below. We'll walk through ScopeLV on one of your own recent bids so you can compare the result against your existing number.
Bring a past bid.
We'll run it live.
See ScopeLV count one of your own plan sets and compare it against the number you submitted.
- 30-minute walkthrough with a low-voltage specialist
- Your drawings, your scope, your numbers
- No commitment